Broadmoor Park

Quick Facts

Size
10,000 + Sq Ft
Tires Recycled
13079
Project Type
Playground
Sherwood Park
Pour In Place Rubber Surfacing Project

Work Scope

Softline Solutions was selected as contractor to complete this project which included removal of the old playground, excavation, installation of a service building, concrete works, equipment and installation of the waterpark. The equipment includes the Kompan Skywalk structure and the UPC Rocks and Ropes structures. Softline has installed the FirstBase impact surfacing through the playground area, a FlexiStep pathway and SealFloor waterpark surface. The waterpark surfacing also features our SplashSafe sealant system which ensures a 100% sealed surface.